logo

Serious Tools > Serious Results

PowerStart 700 12V 22Ah 700ca - Long Leads
PowerStart 700 12V 22Ah 700ca - Long Leads
PowerStart 700 12V 22Ah 700ca - Long Leads
  • Load image into Gallery viewer, PowerStart 700 12V 22Ah 700ca - Long Leads
  • Load image into Gallery viewer, PowerStart 700 12V 22Ah 700ca - Long Leads
  • Load image into Gallery viewer, PowerStart 700 12V 22Ah 700ca - Long Leads

PowerStart 700 12V 22Ah 700ca - Long Leads /

Product ID: 7305228419227 / SKU: 7202-0024-LL
there is no stock
Regular price
£430.95
Tax included.
Sale price
£430.95
Regular price
Sold out
Unit price
per 

Description
Technical Specification
Delivery
Reviews

Description:

• The most popular unit as used by, amongst others, the UK’s leading national recovery operator, for multiple starts on most 12v vehicles. • Double Skinned Wall for increased durability • Extra Long Cables reaching 1.79 metres • Cables & Clamps welding grade cables along with fully insulated cable clamps

Technical Specification:

• Voltage 12V DC • Battery 22Ah • Cranking Amps 700A • Peak Amps 1600A • Cable Length 1.79m

Contents/Size:

Dimensions:

Weight:

Colour:

Technical Specification
Delivery
Reviews